Analisis Faktor-Faktor Keterlambatan Penyelesaian Proyek Infrastruktur Pembangunan Jalan

  • Henny Sjafitri Universitas Tamansiswa Padang
  • Liza Zulbahri Universitas Tamansiswa Padang

Abstract

The purpose of this study is: 1 ) To determine the extent are perceptions of the project actors fakror- main factors that lead to delays in project implementation on a road construction project in Solok , 2 ) To determine the dominant factors that cause keterlamabatan on road construction project in Solok . This study uses descriptive quantitative survey techniques . The population in this study were all parties involved in the activities of the project , both the DGH and the contractor . The sampling technique used was simple random sampling , where samples were taken at random in a population , the number of samples in this study were 96 respondents . The analytical tool used in this study is the use of Test Cochran Test ( Ujang Sumarwan , 2012: 89 ) . The results of this study indicate that the factor of Labor, Factor material, Factor Equipment, Factor Characteristics place, Financial Factors , Factor situation, Factor Change , factors Scope and Contract /Employment Documents, Factor Inspection Systems , Control and Evaluation Jobs , Managerial factors is a factor that causes ketrlambatan on completion of the road construction project in Solok . The most dominant factor of cause keterlamabatan completion of road projects in the district are Soolok labor factor.

References

Digital Collections /jiunkpe/s1/sip4/2006/jiunkpe-ns-s1-2006-21401099-4103-over_cost chapter1.pdf.

http://digilib.petra.ac.id diunggah tanggal 21 Februari 2013.

Indriantoro, Nur dan Bambang Supomo, Metode Penelitian Bisnis Untuk Akuntansi dan Manajemen, Edisi Pertama, Jakarta: BPFE Yogyakarta. 2002

Bina marga Kabupaten solok. Laporan realisasi keuangan dan fiisik pembangunan jalan Kabupaten. tahun 2012

Singarimbuan, Masri. dkk. 1989. Metode Penelitian Survai. LP3ES : Jakarta

Soeharto. Iman. Manajenen Ptoyek Dati Konseprual Sanpai Operusional, Penerbit Erlangga Jakarta. 1995

Sumarwan,U,dkk, riset pemasaran dan konsumen, seri 2, Bogor: PT Penerbit Press Bogor. 2012.

Umar, Husein. 1996. Metode Penelitianm untuk Skripsi dan Tesis Bisnis. PT. Raja Grafindo Persada : Jakarta.

http://www.wikipedia.com
Published
2014-09-01
How to Cite
SJAFITRI, Henny; ZULBAHRI, Liza. Analisis Faktor-Faktor Keterlambatan Penyelesaian Proyek Infrastruktur Pembangunan Jalan. Manajemen dan Kewirausahaan, [S.l.], v. 5, n. 3, p. 111-124, sep. 2014. ISSN 2615-3300. Available at: <https://ojs.unitas-pdg.ac.id/index.php/manajemen/article/view/199>. Date accessed: 03 may 2024.